| Timber Frame Information. | Dance Floor Information. | Building Schedule. | ||
| | ||||
|
The Current State of Affairs. |
||||
|
|
|
||
| Barb | East third of downstairs south wall. Now, both the exterior doors are framed. | Tom | ||
| Floor Sequence One | Frame Assembly and Raising | Roof Assembly | Floor Sequence Two | Wall Framing |